You can only conduct maintenance or repair works on the
Machine only after disconnecting it from the mains.
After long distance or extended transportation of the Ma-
chine, where it undergoes vibrations, shoves and impacts,
please check the integrity of joints of the components to each
other and with functional components, as well as the fitting of
the components and functional nodes.
Before turning ON the Machine please make sure that the in-
ternal components are not covered with condensate, especially
the front glass.
Fig.18 - Transporting the Machine
2.3.2 Installation
After the transportation and/or storage of the Machine:
• Remove the transport packing and remove all packing materials from the Machine (see figure 19);
•
if you discover any visually notable damages to the exterior of the Machine, please inform the man-
ufacturer (supplier);
•
Let the Machine rest idle for at least 5 hours, before turning it ON. The Machine should rest in prem-
ises with normal room temperature
.
1. Carefully bring the Machine, using a fork lift, to the place of installation and raise it by 20…30 cm;
2. Steady the lifter;
3.
Using S=10mm wrench (spanner) remove the fixing bolts and remove the wooden pegs (see figure
19). The bolts with nuts and pegs should be placed in the bag along with the storage packing;
4. Take out the four support pegs, packed for transportation in the dispensing tray, unpack them and
screw it in the corners of the base;
5. Place the Machine on spot and remove the forklift from under it;
6. Using S=34mm spanner adjust the support pegs, to even out the Machine in horizontal plane;
7. To make sure that the installation is even use a level.
NotE:
A tilt of maximum 2
0
(see figure 16a) is permissible. A tilt of more than 2
0
can cause troubles with
the Machine’s operations!