User’s Manual UT5583 Insulation Resistance Tester
Instruments.uni-trend.com
40
/
47
Figure 12-12 Dual Teminal Form a Logic or Circuit
Figure 12-13 Output to PLC Negative Common Terminal
12.5 External Connecting Footswitch
Figure 12-14 Wiring Terminal of Footswitch
Installation Method
Connect the switch between the two terminals of FOOT.C.
Instructions
[Comparison Mode] select to [Period], [Trigger Mode] select to [Internal], other setting to
set according to the actual.
Press the switch, the instrument will start to test.