background image

2

PCFD___24

GLAZING CLOSER 

25mm

SHBC001S

M6 X 21.5mm 

EAVES BOLT

FLN001

M6 FLANGED NUT

DGCE010

GLAZING STOP KIT

CCGA001

EDWARDIAN HIP END CAP 

KDS001

END CAP FIXING 

SCREW

LANRF001

RIDGE END 

BRACKET FIXING 

EBT001

M5 x 12mm

TRILOBULAR SCREW

JRKA004/1

3 BAR TENON 

FIXING

QORER

LANTERN RIDER RAIL

LANCE

LANTERN RIDER RAIL SLEEVE

PSUB

GLAZING SUPPORT 

4719

LANTERN RIDGE TOP CAP

4720

LANTERN RIDGE BODY

Q8053/6

LANTERN RIDGE CENTRAL 

CLADDING

AGS250

TOP CAP GASKET 250M

Q8159/6

LANTERN RIDGE WING 

CLADDING

Q8221

RIDGE BODY GASKET 400M

LVCC001

TOP CAP CLIP

CCG___/25

LANTERN HIP TOP CAP

SPGA___L/1

GEORGIAN GLAZING BAR  

GBCB___C

BAR UNDERCLADDING 

SPT___L/1

LIGHT WEIGHT TRANSOM 

GBCB___C

BAR UNDERCLADDING

CCA___/25

LANTERN TRANSOM TOP CAP

RS4805

LEFT HAND ridgeLOCK 

RS4804

ridgeLOCK CLAMPING PLATE 

RS4806

RIGHT HAND ridgeLOCK 

JRKA001/4

3 BAR TENON 

SPACER

JRT027

3 BAR TENON

RS4809

3 BAR BRACKET

RS4803

RIDGE END INTERNAL 

COVER

AGP___/25

ALUMINIUM GLAZING 

CLOSER 25mm

RS4810

RIDGE END 

WEATHERING SHIELD

JRKA002

JAKC RAFTER HIP BRACKET   

JRT015

TENON  

JRKA001/4

TENON SPACER 

DCM001__/PL

BLANK END CAP INFILL 

RS3823

M5 x 20mm 

TRILOBULAR SCREW

CCTA001

RAFTER END CAP

SPT___L/1

LIGHT WEIGHT TRANSOM 

GBCB___C

BAR UNDERCLADDING

ATC___/25

ALUMINIUM LANTERN

TRANSOM TOP CAP

LVCC001

TOP CAP CLIP

SPGA___L/1

GEORGIAN GLAZING BAR  

GBCB___C

BAR UNDERCLADDING 

LAN___/4

ALUMINIUM LANTERN 

HIP TOP CAP

LVCC001

TOP CAP CLIP

SHBC001SL

M6 X30mm SINGLE BOLT

FLNS001

M6 SPIGGOT NUT

TCAC001

ANCHOR CLIP

RS4811

CENTRAL BAR RIDGE END COVER 

RS4812

RIDGE END 3 BAR 

WEATHERING BARRIER

SHBC001T

TWIN BOLT

RS4807

RIDGE END COVER 

Component Identification Chart 

13233_REV_L 

11/02/2020

LANTERN EAVES

LANTERN RIDGE

LANTERN RIDGE END

THREE BAR ADAPTER

BAR END CAPS

PVC OPTION

COVERS

JACK RAFTER BRACKET

GLAZING COMPONENTS

ALUMINIUM OPTION

Summary of Contents for Classiclantern

Page 1: ...1 V1 January 2020 CLASSIC 20 LANTERN FABRICATION GUIDE...

Page 2: ...to use this guide This guide is designed to help you fabricate the Classic Lantern and covers all the standard preparations required To get the most from this guide we recommend you read and familiar...

Page 3: ...fixing at rider rail prep Transom fixing at ridge prep Transom fixing at rider rail prep Three bar ridge end preparation Fixing jack rafter brackets Hip prep for jack rafters Anchor clip fixing Lanter...

Page 4: ...70mm kerb The rail contains a bolt slot onto which the hips and transoms of the lantern are supported Lantern kerb setout Sizes of the lantern stated in the software paperwork refer to the external ke...

Page 5: ...y be added Cutting the Rider Rail Sleeve 1 Once all four rider rail sleeve sections have been mitred cut the glazing support sections to the lengths and angles specified in the PVC cutting list If you...

Page 6: ...ypes to make up the structure of the roof Below shows the bar assemblies Cutting the glazing bars Working from the roof plan supplied in the Classic software fabrication report cut the glazing bars to...

Page 7: ...se the speedlock glazing bar jig SLADJ001 to accurately drill using a 4 5mm drill bit the mounting holes for the ridgeLOCK components Fit the ridgeLOCK RS4805 RS4086 into the end of the pre drilled hi...

Page 8: ...ine with V groove 150 Eaves End Holes should be in line with V groove Hip fixing at rider rail prep When the hip bars meet the rider rail they are secured with bolts located in the bolt slot of the ri...

Page 9: ...ridge prep On larger lanterns transoms going to the ridge may be specified These are fixed with twin bolts slotted into the ridge body and the rider rail bolt slot Mark the hole positions shown below...

Page 10: ...d cut of 43 on each side This can be seen on the small parts section of the fabrication document JRT027 SPT600L 1 3 Insert the tenon with the plastic spacer in place down the centre of the bar leaving...

Page 11: ...ed on the cutting list Note The dimension given in the report relates to the overall external length of the section including any mitres that may be added 2 Once cut to the desired length apply the re...

Page 12: ...sired locations on the roof 1 Looking at the hip bars in the roof fabrication report take the centre position shown and mark on the hip bar as specified 2 Place the jack rafter hip bracket onto the ba...

Page 13: ...section at the ridge end of the bar The anchor clip should be 170mm from the ridge end of the bar If the bar is a jack rafter then the clip will sit lower than 170mm The angle cut is applied to the ba...

Page 14: ...from the roof plan supplied in the software fabrication report cut the ridge 4720M60 and ridge top cap 4719 to the specified length indicated in the cutting list 2 Looking at the cutting list cut the...

Page 15: ...ber of ridge top cap clips LVCC001 into the aluminium ridge topcap 4719 ensure that they are equally spaced 6 Insert the ridge top cap gaskets AGS250 into the slots on either side of the ridge top cap...

Page 16: ...TERN RIDGE WING CLADDING Q8221 RIDGE BODY GASKET 400M LVCC001 TOP CAP CLIP RS4805 LEFT HAND ridgeLOCK RS4804 ridgeLOCK CLAMPING PLATE RS4806 RIGHT HAND ridgeLOCK AGP___ 25 ALUMINIUM GLAZING CLOSER 25m...

Page 17: ...NON RS4809 3 BAR BRACKET RS4803 RIDGE END INTERNAL COVER RKA002 KC RAFTER HIP BRACKET CCTA001 RAFTER END CAP SPT___L 1 LIGHT WEIGHT TRANSOM GBCB___C BAR UNDERCLADDING ATC___ 25 ALUMINIUM LANTERN TRANS...

Page 18: ...4 Notes...

Page 19: ...5 Notes...

Page 20: ...Ultraframe s policy to continually seek to improve its products processes and services and we reserve the right to change specifications without prior notice Ultraframe is a trading name of Ultraframe...

Reviews: