15
5.1.3
Cut a rubber foam to length and tape it around the loose tube.
5.1.4
Push the loose tubes in the tray and mark them again 15 mm
beyond the second tie wrap.
5.1.5
Strip the loose tubes at this second mark, clean the fibers and
tighten the tie-wraps. Make sure the tie wrap knob is at the side of the
tube.
5.1.6
If necessary, tubes can be bundled with 1 foam. If loose tubes
are added at a later date, use other positions.
5.1.7
If applicable remove all the premounted pigtails out of the
storage area and mark the fibers at the splice holder. Remove the
secondary coating from this point. This assures the transition primary-
secondary is in a straight line!
5.1.8
Position all the pigtails under the splice protection and leave
them there. The fibers have to be kept in this position during further
installation.
5.1.9
Splice the fibers.