5
3.1.4
Determine the position of the shelf (see rack installation
instruction). Fix the cage nuts into the rack mounting uprights (use the
FACC-CAGE-NUT-Tool).
3.1.6
In case of mounting 19" shelves in ETSI rack: mount the
adaption brackets (FIST-MB2-2HU-M).
3.1.5
Mount the shelf using the FACC-ALLEN-Key.
3.1.3
Space requirements
1
minimum 60 mm at left/right for horn and IFC or pigtails.
2
minimum 60 mm at left /right in case of cable side termination.
3
minimum 45 mm at back in case of cable back termination.
Spacing between adjacent units may vary depending on frame upright
pitch and cable management products!
3.2
Preparation of the shelf
3.3
Preparation of the trays
3.2.1
Pull the drawer to the fully open position and rotate the
security-lip 180° to prevent the drawer from moving back inside the
unit.
3.2.2
A trumpet is needed at the side where the pigtails are entering
the shelf. Slide the trumpet in the side panel. Make sure the smallest
side of the trumpet is inside the shelf.
3.3.1
To make a tray accessible raise all the trays above. Keep these
in position by using two tray wedges. Make sure that the bottom tray
has the adaptors positioned at the left side.