10
4.2.7
Insert the strength members from the cable into the strength
member stop. In case cable diameter is more than 8mm, Fix the cable
with the hose clamp onto the loopbracket. In case cable diameter is
less than 8mm. Fix the cable with tie wrap onto the loopbracket Fix the
screw of the strength member stop on the loopbracket. Wind a few
layers of tape around the hose clamp.
When using cables with a diameter smaller than 12mm,bend
the sharp edges on the bottom of the bracket towards the
cable and use some tape around the bracket to protect the
heatshrink.
4.2.9
Place the heatshrink and loop bracket in place as described in
loose tube installation.
4.2.8
Take the spiral tube and cut it at
160mm
length.
Put the tube over the bundle fibers and insert this in the central cavity
of the loop breakout device.