4.2.43
Remove the ID cords or compact sheet till about 10mm after
the spiral tube; use teflon to bundle the fibers and the ID cord. Position
the spiral tubes in the respective tubeholder. Put the tube holder
retainer.
16
4.2.40 Fix the strength member plates in the closure.
Use FACC-DSCT for dual strength member cables.
4.2.41 Fix the cable in it.
4.2.42
Install the heatshrink (see section 5).