4
TRANSPORT AND INSTALLATION
50/87
561405 - IS19/07 - EN
4.3.2
Pipe connection
Check the pipes, gaskets and fittings as described in § 6.1.6-7-8-9.
Lay the pipes and avoid them from twisting during material conveying. The first ten metres of piping are subject to oscillations
(a few centimetres) during transport: it is advisable to raise this section from the ground and prevent it from resting on edges or
abrasive elements.
Anchor the pipes properly:
- Horizontal pumping
Lay piping as desired and connect it to the first section previously described to pump material horizontally.
- Vertical pumping
The vertical piping section must be fixed and supported using the appropriate collars (FIG. 4-11).
- Downward pumping
The downward piping section must be fixed and supported using the appropriate collars (FIG. 4-12).
Arrangements must be made to stop the concrete fall in the downward section (e.g. assemble a bend or S-bend - as in FIG.4-
12 or make tilted sections). For this type of layout, we recommend lubricating pipes with grout as follows:
- introduce two wash sponges in the piping's initial section (FIG. 4-13).
- Pump the grout. The entire internal surface of the downward section will, in this way, be lubricated.
Introduce more sponges and more grout if the downward section is particularly long.
1
Summary of Contents for TB30
Page 1: ...Serial number Year USE AND MAINTENANCE MANUAL TB30 IS19 07 561405 EN ORIGINAL ...
Page 2: ......
Page 5: ......
Page 10: ...1 GENERAL INFORMATION 10 87 561405 IS19 07 EN 1 3 EC DECLARATION OF CONFORMITY FACSIMILE ...
Page 13: ...GENERAL INFORMATION 1 561405 IS19 07 EN 13 87 ...
Page 42: ...3 SAFETY AND PREVENTION 42 87 561405 IS19 07 EN ...
Page 43: ...SAFETY AND PREVENTION 3 561405 IS19 07 EN 43 87 ...
Page 53: ...TRANSPORT AND INSTALLATION 4 561405 IS19 07 EN 53 87 ...
Page 56: ...5 USE AND OPERATION 56 87 561405 IS19 07 EN 5 2 INSTRUMENTS ON THE MACHINE ...