Operation
23
Pos: 45 /Tuchel/Betrieb/Inbetriebnahme @ 1\mod_1197557474328_21.doc @ 9922
Placing into operation
Before placing the machine into operation, every operator must
have carefully read and understood the available operating
manual as well as the operating manuals for the host vehicle and
the accessory equipment.
WARNING!
Damage or defects on the sweeper shovel attachment
or the host vehicle can lead to accidents.
•
If defects are found during the following test, the
sweeper shovel attachment may not be operated
until it has been properly repaired.
•
The sweeper shovel attachment may only be
operated in a technically sound state and used for
its intended purpose in accordance with regulations.
Before placing into operation
Only valid for sweeper shovel attachment with water spraying unit:
Before using the sweeper shovel attachment for the first time, the
switching box must be attached to the host vehicle.
1. Attach the switching box (1) to the host vehicle at the
appropriate position.
WARNING!
Live parts can lead to electric shock.
•
Work on the electrical system may only be
performed by qualified personnel.
000055
1
2
2. Connect the electrical connection line (2) to the electrical
power supply of the host vehicle.
Summary of Contents for Big
Page 1: ...1 0 2008 02 01 Instruction manual 000050 Sweeper shovel attachment ...
Page 54: ......
Page 55: ......