A.3
Hoval
Caution
Risk of injury from incorrect handling. Transport, assembly and installation
work may only be performed by specialists!
1 Preparation
■
Check that the delivery is complete:
–
4 exchanger blocks
–
1 cartridge of sealing compound
–
Auxiliary materials for installation (rivets, self-cutting screws)
–
6 angle brackets (depending on the width of the exchanger)
Notice:
Angle brackets are not installed in exchangers with a width of
up to 1500 mm.
–
Option: Control damper (one-piece for size 140/170, two-piece for size
200/240)
■
Required tools:
–
Hoisting equipment to lift the components
–
Cartridge gun
–
Rivet gun
–
Drill
–
Power screwdriver
■
Identify the correct position of exchanger blocks 1 to 4:
–
Each side wall has a flattened corner. These corners make up the outer
edges of the exchanger once assembled.
–
For exchangers with a bypass (option): make sure that the bypass is aligned
correctly.
Fgi. 1: Compound plate heat exchanger (shown here
with a side bypass and control damper)
Exchanger blocks nos. 1 – 4
Angle bracket
Flattened corner of the side wall
Side bypass (option)
Control damper (option)
Positioning holes for the control
damper (on all sides)
Installation of compound
plate heat exchangers
Art. No. 4 212 499-en-00 / Page 1
Supplier documents
Air handling unit X-CUBE Ex
123