6
Installation
6.1 General installation information
Before installation
Before you install the unit, take suitable precautions to
protect air distribution components from contamination
during installation
⇨
VDI 6022.
If this is not possible, at least cover the unit or take
other precautions to protect it from contamination. In
this case you have to ensure that the unit cannot be
started.
Ensure that all components are clean before you install
them. If necessary, clean them thoroughly. If you have
to interrupt the installation procedure, protect all open-
ings from the ingress of dust or moisture.
Installation information
Install the ventilation unit preferably in a thermally
insulated, low-leakage building.
Frost free and dry installation location.
Installation and connections to be performed by
others; fixing, connection and sealing material to be
provided by others
Install the unit only on structural elements that can
carry the load of the unit.
Use only certified fixing systems.
The room facing side of the unit must remain com-
pletely accessible for maintenance and cleaning.
6.2 Installation
Personnel:
HVAC technician
Tool:
Stair climber
Pallet truck
2 vacuum lifters (
≥
100 kg each vertical lifting force)
Drill
TROX special key
Important:
Only join components with the same serial
number,
Chapter 3.2 ‘Rating plate’ on page 10
~ 50 cm
Fig. 7: Setting up the mounting base
1.
Position the mounting base of the device approx.
50 cm in front of the wall at the installation site
(space required for installation).
②
①
Fig. 8: Disassembling the matching rear frame
2.
Loosen the screws ( Fig. 8 /2) on the top of the
device from the matching rear frame. Remove the
frame ( Fig. 8 /1) and store for later assembly.