STEP 10
Make sure the Lower Cable (52) is in the groove of Pulley (32),
• Install Pulley A into the slot of the Upright Frame (5) using one 3/8” x 2-5/8” Hex Bolt (57), two 3/8” Washers (64), two Bushings
(36) and one 3/8” Locknut (67).
• Install Pulley B into the bracket of the Back Base Tube (2) using one 3/8” x 2” Hex Bolt (56), two 3/8” Washers (64) and one 3/8”
Locknut (67).
• Install Pulley C between the two pieces of the Adjust Pulley Bracket (27) using one 3/8” x 2” Hex Bolt (56), two 3/8” Washers
(64) and one 3/8” Locknut (67).
• Install Pulley D into the slot of the Upright Frame (5) using one 3/8” x 2-5/8” Hex Bolt (57), two 3/8” Washers (64), two
Bushings (36) and one 3/8” Locknut (67).
• Attach the end of the Lower Cable (52) to the Single Pulley Bracket (26) using one Chain Hook (30).
• Attach the other end of the Lower Cable (52) to the Lower Bar (22) using one Chain (28) and two Chain Hooks (30).
10148-15
4. ASSEMBLY STEPS - CAGE
Summary of Contents for POWER RACK 400
Page 6: ...10148 6 3 HARDWARE LIST CAGE...
Page 7: ...10148 7 3 HARDWARE LIST CAGE...
Page 8: ...10148 8 3 HARDWARE LIST CAGE...
Page 18: ...10148 18 5 HARDWARE LIST BENCH...
Page 19: ...10148 19 5 HARDWARE LIST BENCH...