81
Troubleshooting manual
AT.654254.050 ver.1.0
3.
Uninstall current sensors. For that move cables aside from buses, after that take
off current sensors from buses, as shown on the figure 33.
Figure 33
–
Uninstall current sensors
Step 3. Installation new current sensors
1.
Installation of a new current sensors must be done in reversal sequence. Bolts
must be tightened with a torque:
M10
–
30 ± 1,5 N•m
M8
–
22 ± 1,5 N•m
All signal connectors must be installed to their positions and tightened
with their original screws and connected to case via cable ties.