48
AT.654254.050 ver.1.0
Troubleshooting manual
Short circuit full load test procedure
1.
Install jumpers on the output of VSD between three output phases. Diameter
of cables must be suitable for full VSD current level.
Figure 26
–
Scheme of jumper installation for full load test