Alignment, component installation and commissioning
Check / correct with tool carrier 2
• Move tool carrier to the limit position Z+.
• Mount the invariable fixture in position 1 of the turret on tool carrier 2.
• Place two spirit levels on the fixture, one in Z-direction and one in X-direc-
tion.
X
X
Z
Z
• Advance in Z-direction to check the machine and uniformly adjust the
right or left feet to re-align it if necessary. The deviation must not exceed
0.01 mm over the entire distance traveled.
• Move to the limit position Z- to check the machine’s torsion. The deviation
must not exceed 0.01 mm over the entire distance traveled. If this is not
the case, the machine must be re-aligned by adjusting the appropriate outer
foot.
• Secure the adjusting screws of the feet with the locknuts.
Switch off the control system, disconnect the machine from the
power supply and secure it so that it cannot be reactivated.
Summary of Contents for TNX65/42
Page 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Page 10: ...10 14 03 2022 TNX65 42 Safety...
Page 20: ...20 14 03 2022 TNX65 42 General information...
Page 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Page 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Page 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Page 54: ...54 10 2016 TNX65 42 Fuels...
Page 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Page 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Page 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Page 65: ......