If the machine is equipped with a chip conveyor, a chip trolley, its height match-
ing the chip conveyor's discharge height, is required.
The chip trolley should have a device for draining the accumulating cooling lubri-
cant so it can be returned to the cooling lubricant tank.
Chip conveyor without discharge chute
If using a chip conveyor without a discharge chute, the collection bin
for the chips must be provided by the customer with a cover.
The cover must be designed such that it is not possible to reach into
the discharge area of the chip conveyor.
Disposal of used operating materials
The directives and regulations applicable in the country of use must
be followed.
Decide in advance on how to dispose of used operating fluids such as hydraulic
fluid, lubricating oil, and cooling lubricant in an environmentally friendly manner.
Observing the ground and wastewater regulations
The directives and regulations applicable in the country of use must
be followed.
The machine contains water-polluting substances such as water-miscible cool-
ing lubricants and mineral oils. These substances may leak from the machine in
case of adverse events.
Therefore, the machine must be installed in a place that excludes any harm by
these substances to waters or groundwater.
Possible preventive measures
• Place the machine inside a tight steel trough (floor trough).
• Seal the floor of the factory hall.
Summary of Contents for TNX65/42
Page 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Page 10: ...10 14 03 2022 TNX65 42 Safety...
Page 20: ...20 14 03 2022 TNX65 42 General information...
Page 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Page 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Page 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Page 54: ...54 10 2016 TNX65 42 Fuels...
Page 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Page 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Page 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Page 65: ......