Preparations
This section is addressed to the persons responsible for the installation and
their staff.
The information provided here allows you to prepare the installation site and its
surroundings such that the machine, when delivered, can be installed and put
into operation immediately.
Be sure to carefully plan the delivery, unloading, and transporting of the ma-
chine from the unloading site to the installation site.
The installation plan applicable for this machine was already submit-
ted for approval after the contract award.
Upon delivery of the machine, it is included in Chapter
Diagrams and
drawings
on the supplied data carrier.
Take the size (dimensions) and masses of each unit into consideration.
Suitable transporting and lifting means must be available when the machine is
delivered.
Any obstacles along the transport route from the unloading site to the installa-
tion site must be eliminated before the machine is delivered.
Check the transport route for load capacity, levelness, damaged pavement,
traverse grooves, slopes, gradients, etc.
Is the width and height of entrances and gates sufficient?
If elevators are to be used, do they have sufficient capacities?
Proper planning will pay off!
Suitable transporting and lifting aids
–Crane
–Truck-mounted crane
–Forklift
–Transport trolley
–Transport rollers
–Armored rollers
–Hydraulic jacks
–Forklift (only for separate units).
General information
Summary of Contents for TNX65/42
Page 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Page 10: ...10 14 03 2022 TNX65 42 Safety...
Page 20: ...20 14 03 2022 TNX65 42 General information...
Page 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Page 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Page 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Page 54: ...54 10 2016 TNX65 42 Fuels...
Page 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Page 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Page 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Page 65: ......