
47
10.2016
TNX65/42
Installation of the milling unit components
Installation of the tool chain and chain magazine
(only with optional 120 positions)
Install upper part of chain magazine
Danger due to falling parts
Ensure there is no-one underneath the suspended load!
• Lift the upper part of the chain magazine with the aid of eyebolts and a
crane.
A suitable fork lift truck can also be used instead of a crane. In this case,
two brackets must be screwed onto the M12 threads provided for this pur-
pose (the brackets Art. No. 095662 are available on loan from TRAUB).
Requirements to be met by a fork lift truck
Min. lifting height
mm
3500
Min. fork length
mm
1000
Max. fork width
mm
150
Forks adjustable to a minimum distance of
mm
114
• Carefully lower the upper part of the chain magazine over the connecting
plate in the bottom part of the chain magazine.
• Remove the eyebolts or brackets Art. No. 095662.
Connecting plate
Attach brackets Art. No. 095662 for
installation with a fork lift truck
Attach eyebolts for installation with a crane
Summary of Contents for TNX65/42
Page 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Page 10: ...10 14 03 2022 TNX65 42 Safety...
Page 20: ...20 14 03 2022 TNX65 42 General information...
Page 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Page 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Page 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Page 54: ...54 10 2016 TNX65 42 Fuels...
Page 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Page 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Page 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Page 65: ......