![background image](http://html1.mh-extra.com/html/transtank/floodrite/floodrite_operators-handbook-manual_1152630022.webp)
1800 816 277
www.tti.com.au
22
FloodRite
™
Product HandBook
Maintenance
Your FloodRite™ Dust Suppression Unit requires minimal maintenance but regular cleaning and checks will
ensure safe and reliable service over its lifetime. Periodic checks and inspections will identify any potential
issues, enabling timely rectification and minimising downtime.
Periodic Checks
CAUTION! In dusty, dirty or smoky environments, cleaning, inspection and
servicing of the unit on a regular basis is essential. The cleaning, inspection
and servicing must be undertaken more frequently in harsh conditions to
avoid damage or destruction of equipment.
The following checks and cleaning operations should be undertaken on a regular basis (at least annually).
The frequency of these activities will depend on the nature of the operating environment and the operational
hours of the FloodRite™ unit.
1. Clean the unit and inspect it for any signs of damage or wear. Replace any safety labels if they are
damaged or illegible.
2. Check all fittings are firmly secured, tighten if necessary.
3. Unwind the hose from the reel fully to check that hose is in good order. Pressurise the line and check
operation of spray nozzle. Rewind the hose onto the reel, ensuring it retracts all the way.
4. Check the condition of the batteries in the remote control unit. If the battery power display indicates low
power, replace them with 3 new AAA batteries.
5. Check the pump engine’s oil level weekly.
6. Check the condition of the pump engine’s 12 volt battery, replace it or charge it as necessary.
7. If the FloodRite™ is to be stored for an extended period, ensure the tank and all pipelines are empty and
are not pressurised. Store the unit is a clean, dry and well-ventilated area.
Maintenance Schedule
The following tasks are be conducted in accordance with each of the schedules. All scheduled tasks are to
be undertaken concurrently. For example, at the three month maintenance interval, all task listed are to be
undertaken, in addition to the daily, weekly and monthly tasks.
NOTE! Maintenance is important. Keep a record of all maintenance tasks
conducted on the FloodRite unit.
TTi recommends photocopying these schedules in order to keep a detailed log of all maintenance tasks. A
copy of these schedules will be required to support any warranty claim.