Trane optimizes the performance of homes and buildings around the world. A business of Ingersoll Rand, the
leader in creating and sustaining safe, comfortable and energy efficient environments, Trane offers a broad
portfolio of advanced controls and HVAC systems, comprehensive building services, and parts. For more
information, visit www.Trane.com.
Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice.
We are committed to using environmentally
conscious print practices that reduce waste.
All trademarks referenced in this document are the trademarks of their respective owners.
8. Owner awareness
If it is required by local code, is a self-contained breathing apparatus available?
Has the owner been fully instructed on the proper use of refrigerant?
Does the owner have a copy of the MSDS for refrigerant?
Was the owner given a copy of the Refrigerant Handling Guidelines?
Note:
Additional time required to properly complete the start-up and commissioning, due to any incompleteness of the
installation, will be invoiced at prevailing rates.
This is to certify that theTrane
®
equipment has been properly and completely installed, and that the applicable items listed above
have been satisfactorily completed.
Checklist completed by: ______________________________________________________________________________________________
Signed: _____________________________________________________________________
Date: _______________________________
In accordance with your quotation and our purchase order number __________________, we will therefore require the presence
of Trane service on this site, for the purpose of start-up and commissioning, by __________________ (date).
Note:
Minimum two-week advance notification is required to allow scheduling of the chiller start-up.
Additional comments/instructions: ____________________________________________________________________________________
_____________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________
Note:
A copy of this completed from must be submitted to theTrane Service Office that will be responsible for start-up of chiller.
© 2015 Trane All rights reserved
RTAF-ADF001A-EN 05 Jun 2015
(New)