6
RTAA-SVX01A-EN
General Information
Lists unit test pressures.
Identifies installation, operation and maintenance and service data
literature.
Lists drawing numbers for unit wiring diagrams.
Pump Package Information - Optional
Compressor Nameplate
The compressor nameplate provides following information:
Compressor model number.
Compressor serial number.
Compressor electrical characteristics.
Utilization range.
Recommended refrigerant.
Unit Inspection
When the unit is delivered, verify that it is the correct unit and that it is
properly equipped. Compare the information which appears on the unit
nameplate with the ordering and submittal information.
Inspect all exterior components for visible damage. Report any apparent
damage or material shortage to the carrier and make a “unit damage”
notation on the carrier's delivery receipt. Specify the extent and type of
damage found and notify the appropriate Trane Sales Office.
Do not proceed with installation of a damaged unit without sales office
approval.
NOTE:
If the Remote Evaporator Option is ordered, the remote evaporator
will be shipped in a separate crate.
Inspection Checklist
To protect against loss due to damage incurred in transit, complete the
following checklist upon receipt of the unit.
•
Inspect the individual pieces of the shipment before accepting the unit.
Check for obvious damage to the unit or packing material.
•
Inspect the unit for concealed damage as soon as possible after delivery
and before it is stored. Concealed damage must be reported within 15
days after receipt.
•
If concealed damage is discovered, stop unpacking the shipment. Do not
remove damaged material from the receiving location. Take photos of the
damage. The owner must provide reasonable evidence that the damage
did not occur after delivery.
•
Notify the carrier’s terminal of the damage immediately, by phone and by
mail. Request an immediate, joint inspection of the damage with the car-
rier and the consignee.
•
Notify the Trane sales representative and arrange for repair. Do not repair
the unit, however, until damage is inspected by the transportation repre-
sentative.
Loose Parts Inventory
Check all the accessories and loose parts which are shipped with the unit
against shipping list. Included in these items will be water vessel drain plugs,
isolators, rigging and electrical diagrams, and service literature, which are
placed inside the control panel and/or starter panel for shipment.
Summary of Contents for RTAA-100
Page 110: ...110 RTAA SVX01A EN Start Up Procedures Figure 37 Unit Sequence of Operation...
Page 143: ...RTAA SVX01A EN 143 Pump Package Figure 47 Pump Package Piping Schematic...
Page 144: ...144 RTAA SVX01A EN Pump Package...
Page 146: ...146 RTAA SVX01A EN 3327...
Page 147: ...RTAA SVX01A EN 147...
Page 148: ...148 RTAA SVX01A EN 3328...
Page 149: ...RTAA SVX01A EN 149...
Page 150: ...150 RTAA SVX01A EN 6516...
Page 151: ...RTAA SVX01A EN 151...
Page 152: ...152 RTAA SVX01A EN 3329...
Page 153: ...RTAA SVX01A EN 153...
Page 154: ...154 RTAA SVX01A EN 6472...
Page 155: ...RTAA SVX01A EN 155...
Page 156: ...RTAA SVX01A EN 156 3330...
Page 157: ...157 RTAA SVX01A EN...
Page 158: ...158 RTAA SVX01A EN 6046...
Page 159: ...RTAA SVX01A EN 159...
Page 160: ...160 RTAA SVX01A EN 3331...
Page 161: ...RTAA SVX01A EN 161...
Page 162: ...162 RTAA SVX01A EN 6519...
Page 163: ...RTAA SVX01A EN 163...
Page 164: ...164 RTAA SVX01A EN 6047...
Page 165: ...RTAA SVX01A EN 165...
Page 166: ...166 RTAA SVX01A EN 3325...
Page 167: ...RTAA SVX01A EN 167...
Page 168: ...168 RTAA SVX01A EN 6048...
Page 169: ...RTAA SVX01A EN 169...
Page 172: ...172 RTAA SVX01A EN 3326...
Page 173: ...RTAA SVX01A EN 173...
Page 174: ...174 RTAA SVX01A EN 6049...
Page 175: ...RTAA SVX01A EN 175...
Page 176: ...176 RTAA SVX01A EN 6463...
Page 177: ......