RTAA-SVX01A-EN
137
Pump Package
WARNING
Hazardous Voltage!
Disconnect all electric power, including remote disconnects
before servicing. Follow proper lockout/tagout procedures to
ensure the power can not be inadvertently energized. Failure to
disconnect power before servicing could result in death or serious
injury.
1.
Place panel disconnects(s), H/O/A switches, and control power On/Off
switch (if provided) to the "Off" position.
2.
Open the panel and visually check components for any shipping damage
and verify that all power leads are secure (see "Tightening Torque Refer-
ence Guide" label on inner panel door).
3.
Switch main power supply disconnect to "ON". This will provide power to
the terminal block of the Booster System Control Panel. Verify the power
supply agrees with the Booster System Panel.
IF NOT PROCEEDING WITH START UP AT THIS TIME, DISCONNECT
POWER SUPPLY TO PANEL.
Pump Checkout Procedure
1.
Verify electric power and water are available.
2.
All valves, including main suction valve and discharge valves must be in
closed position.
3.
If unit is in storage for more than 3 months, rotate each pump by hand.
Units should turn freely.
4.
Open the main suction valve on inlet to system manifold and check suc-
tion pressure against specifications.
5.
Slowly open suction valve to one pump at a time. Check pump units and
fittings for leaks.
6.
Vent each pump volute by loosening a pipe plug at the highest point to
assure no air is trapped which would cause seal failure and/or pump
"vapor lock".
7.
Slowly open pump discharge valve - one pump at a time. Check fittings
for leaks. DO NOT OPEN MAIN DISCHARGE VALVE (Multi-Purpose
Valve) ON OUTLET OF SYSTEM MANIFOLD AT THIS TIME.
Control Panel Checkout
YOU WILL BE UNABLE TO PROCEED WITH THIS SECTION UNTIL
REQUIREMENTS OF CONNECTING POWER SOURCE
1.
Confirm the suction pressure is adequate.
2.
Energize power supply to panel if necessary.
Summary of Contents for RTAA-100
Page 110: ...110 RTAA SVX01A EN Start Up Procedures Figure 37 Unit Sequence of Operation...
Page 143: ...RTAA SVX01A EN 143 Pump Package Figure 47 Pump Package Piping Schematic...
Page 144: ...144 RTAA SVX01A EN Pump Package...
Page 146: ...146 RTAA SVX01A EN 3327...
Page 147: ...RTAA SVX01A EN 147...
Page 148: ...148 RTAA SVX01A EN 3328...
Page 149: ...RTAA SVX01A EN 149...
Page 150: ...150 RTAA SVX01A EN 6516...
Page 151: ...RTAA SVX01A EN 151...
Page 152: ...152 RTAA SVX01A EN 3329...
Page 153: ...RTAA SVX01A EN 153...
Page 154: ...154 RTAA SVX01A EN 6472...
Page 155: ...RTAA SVX01A EN 155...
Page 156: ...RTAA SVX01A EN 156 3330...
Page 157: ...157 RTAA SVX01A EN...
Page 158: ...158 RTAA SVX01A EN 6046...
Page 159: ...RTAA SVX01A EN 159...
Page 160: ...160 RTAA SVX01A EN 3331...
Page 161: ...RTAA SVX01A EN 161...
Page 162: ...162 RTAA SVX01A EN 6519...
Page 163: ...RTAA SVX01A EN 163...
Page 164: ...164 RTAA SVX01A EN 6047...
Page 165: ...RTAA SVX01A EN 165...
Page 166: ...166 RTAA SVX01A EN 3325...
Page 167: ...RTAA SVX01A EN 167...
Page 168: ...168 RTAA SVX01A EN 6048...
Page 169: ...RTAA SVX01A EN 169...
Page 172: ...172 RTAA SVX01A EN 3326...
Page 173: ...RTAA SVX01A EN 173...
Page 174: ...174 RTAA SVX01A EN 6049...
Page 175: ...RTAA SVX01A EN 175...
Page 176: ...176 RTAA SVX01A EN 6463...
Page 177: ......