38
RTAA-SVX01A-EN
Installation — Remote Evaporator
Line Sizing
To determine the appropriate outside diameter for field installed liquid and
suction lines, it is first necessary to establish the equivalent length of pipe for
each line. It is also necessary to know the capacity (tons) of each circuit.
Circuit capacities for each RTAA unit are listed in
Table 2
.
Liquid Line Sizing Steps
Line sizing is an iterative process. While iterating to determine the proper
equivalent line length use the “Horizontal or Downflow” column of
Table 4
.
After the final equivalent line length has been determined in step # 9, then
break down the piping into it's “Horizontal or Downflow” and “Upflow”
components and select the proper outside diameter. Note that “Upflow” has
a column for one to five, six to ten, and eleven to fifteen feet.
The steps to compute liquid line size are as follows:
1.
Compute the actual length of field installed piping.
2.
Multiply the length from step # 1 by 1.5 to estimate the equivalent length.
3.
Using
Table 4
for the proper tonnage circuit, look in the “Horizontal or
Downflow” column. Find the outside diameter that corresponds to the
equivalent length computed in step # 2.
4.
With the outside diameter found in step # 3, use
Table 3
to determine the
equivalent lengths of each fitting in the field installed piping.
5.
Sum the equivalent lengths of all the field installed elbows.
6.
Add the length found in step # 5 to the actual length from step # 1. This is
your new equivalent line length.
7.
Using
Table 4
again, find the new outside diameter that corresponds to
the new equivalent line length from step # 6.
8.
Using Table 2b and the new outside diameter found in step # 7, find the
equivalent line length of each elbow, and sum them.
9.
Add the length found in step # 8 to the actual length from step # 1. This is
your final equivalent line length.
10.
With the final equivalent line length found in step # 9, use
Table 4
to
select the proper outside diameter for horizontal or downflow lines, and
any upflow lines.
Summary of Contents for RTAA-100
Page 110: ...110 RTAA SVX01A EN Start Up Procedures Figure 37 Unit Sequence of Operation...
Page 143: ...RTAA SVX01A EN 143 Pump Package Figure 47 Pump Package Piping Schematic...
Page 144: ...144 RTAA SVX01A EN Pump Package...
Page 146: ...146 RTAA SVX01A EN 3327...
Page 147: ...RTAA SVX01A EN 147...
Page 148: ...148 RTAA SVX01A EN 3328...
Page 149: ...RTAA SVX01A EN 149...
Page 150: ...150 RTAA SVX01A EN 6516...
Page 151: ...RTAA SVX01A EN 151...
Page 152: ...152 RTAA SVX01A EN 3329...
Page 153: ...RTAA SVX01A EN 153...
Page 154: ...154 RTAA SVX01A EN 6472...
Page 155: ...RTAA SVX01A EN 155...
Page 156: ...RTAA SVX01A EN 156 3330...
Page 157: ...157 RTAA SVX01A EN...
Page 158: ...158 RTAA SVX01A EN 6046...
Page 159: ...RTAA SVX01A EN 159...
Page 160: ...160 RTAA SVX01A EN 3331...
Page 161: ...RTAA SVX01A EN 161...
Page 162: ...162 RTAA SVX01A EN 6519...
Page 163: ...RTAA SVX01A EN 163...
Page 164: ...164 RTAA SVX01A EN 6047...
Page 165: ...RTAA SVX01A EN 165...
Page 166: ...166 RTAA SVX01A EN 3325...
Page 167: ...RTAA SVX01A EN 167...
Page 168: ...168 RTAA SVX01A EN 6048...
Page 169: ...RTAA SVX01A EN 169...
Page 172: ...172 RTAA SVX01A EN 3326...
Page 173: ...RTAA SVX01A EN 173...
Page 174: ...174 RTAA SVX01A EN 6049...
Page 175: ...RTAA SVX01A EN 175...
Page 176: ...176 RTAA SVX01A EN 6463...
Page 177: ......