19
CDHF-SVU01C-EN
General
Information
Sequencing - Balanced Starts and
Hours
When desired to balance the wear
between the compressors. This
method will extend the time between
maintenance on the lead compressor.
When balanced starts and hours is
selected, the compressor with the
fewest starts will start. If that
compressor is unavailable to start
due to a circuit lockout (including
restart inhibit) or a circuit diagnostic,
then the other compressor will be
started. The second compressor will
stage on when chiller capacity
exceeds the Stage on Load point for
30 seconds. When chiller capacity
falls below Stage off Load point for
30 seconds, the compressor with the
most hours will be shut off.
Figure 14. CDHF/G sequence of operation: equalize starts and hours
Summary of Contents for CenTraVac Duplex CDHE
Page 23: ...23 CDHF SVU01C EN General Information Figure 16 Oil refrigerant pump circuit 1 or 2 ...
Page 52: ...CDHF SVU01C EN 52 Control System Components Figure 24 Control panel components layout ...
Page 53: ...53 CDHF SVU01C EN Control System Components ...
Page 65: ...65 CDHF SVU01C EN Control System Components ...
Page 66: ...CDHF SVU01C EN 66 Control System Components ...
Page 104: ...CDHF SVU01C EN 104 ...
Page 105: ...105 CDHF SVU01C EN ...
Page 106: ...CDHF SVU01C EN 106 ...
Page 107: ...107 CDHF SVU01C EN ...
Page 108: ...CDHF SVU01C EN 108 ...
Page 109: ...109 CDHF SVU01C EN ...
Page 110: ...CDHF SVU01C EN 110 ...
Page 111: ...111 CDHF SVU01C EN ...
Page 112: ...CDHF SVU01C EN 112 ...
Page 113: ...113 CDHF SVU01C EN ...
Page 114: ...CDHF SVU01C EN 114 ...
Page 115: ...115 CDHF SVU01C EN ...