43
TRIAD Boiler Systems, Inc.
West Chicago, IL
www.triadboiler.com
Review the burner manual.
Review the wiring diagrams, operating sequence, piping schematics, installation drawings, and any
other pertinent information for the particular pieces of equipment.
Before applying electrical power to the unit, check all electrical connections to ensure they are secure
and properly connected
Before applying fuel to the unit, check all piping to ensure it is arranged per the drawings and that all
connections are tight
DO NOT START THE BURNER UNLESS ALL CLEANOUT DOORS ARE SECURED IN PLACE.
6.3 Tools & gauges
Before you begin, check that the following tools & gauges are installed or available:
Stack thermometer, 50-500°F
Temperature gauge appropriate for your size of boiler
Flue gas analyzer
U-tube inclined type manometer to measure stack draft and furnace pressure
U-tube or calibrated gauge for gas pressure
Multi-meter
Meter to measure flame signal
A stack velocity meter, if you need to verify stack flow
6.4 Fuel guidelines
Do not attempt to relight the pilot or start burner with the combustion chamber full of gas, or with
very hot combustion chamber.
Do not use gasoline, crankcase drainings, or any oil containing gasoline.
NEVER BURN GARBAGE OR PAPER IN THE UNIT, AND NEVER LEAVE COMBUSTIBLE MATERIAL
AROUND IT.
Review all safety guidelines
6.5 Cleaning and filling a new boiler
Prior to starting a new boiler an inspection should be made to insure that no foreign matter such as tools,
equipment, rags, etc., is left in the boiler.
Before putting water into a new boiler, make certain that the firing equipment is in operating condition
to the extent that this is possible without actually lighting a fire in the empty boiler. This is necessary
because raw water must be boiled [or heated to at least 180°F)] promptly after it is introduced into the
boiler in order to drive off the dissolved gases, which might otherwise corrode the boiler.
In a hot water heating system, the boiler and entire system (other than the expansion tank) must be full
Summary of Contents for Triumph 1000
Page 14: ...14 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com Handling Options ...
Page 20: ...20 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com Model 300 500 Model 750 1000 ...
Page 27: ...27 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com 2 6 Example wiring diagrams ...