loaded on a valve outlet exceeds a short elbow with a drip pan.
6 Boiler start-up
The design, manufacture, and assembly of your new unit is the result of years of engineering work and
field testing. It is a sophisticated piece of equipment to be serviced only by qualified people. If you don't
already have a qualified operator, we recommend that you contact your TRIAD representative for the
name of experienced service personnel in your area. The lack of a qualified operator can invalidate the
warranty.
Each burner can vary in details, but the following should help outline the steps involved with first time
startup. The following section is provided as is, your burner manual will provide many details for safe first
time start up.
WARNING! The improper installation, adjustment, service, maintenance, or operation of this
equipment can result in fire, explosion, series injury, or death.
All Personnel involved with the startup, maintenance, or adjustment of this boiler must read and
understand the entire contents of this manual prior to any startup or adjustment made to the boiler
and related components. Installation and service must be performed by a qualified installer, service
agency or the fuel supplier.
6.1 Operating data
Whenever a new boiler is placed in service, operating data should be recorded, compared to predicted
performance, and saved for future reference. This information is extremely valuable for diagnosing
problems if abnormal operation occurs. Record all operating parameters such as pressures, temperatures,
flows, draft losses, motor amps, turbine speeds, damper positions, and interlock set points.
This data assists operators to spot trends and take corrective action. Maintenance plans can be made by
comparing the routine logs to the base data. For operating data to be meaningful, the instruments and
controls must be well maintained and properly calibrated.
A new or relocated power boiler should not be put into operation until it has been inspected by an
Authorized Inspector for the jurisdiction or insurance company and the required certificates have been
issued.
6.2 Start-up guidelines
Start-up and testing of new unit is a SERIOUS matter.
Take time to become familiar with the equipment you will be working with.
Summary of Contents for Triumph 1000
Page 14: ...14 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com Handling Options ...
Page 20: ...20 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com Model 300 500 Model 750 1000 ...
Page 27: ...27 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com 2 6 Example wiring diagrams ...