TRIAD Boiler Systems, Inc.
West Chicago, IL
www.triadboiler.com
LWCO mark:
Used to determine the correct elevation of the LWCO switch. Line this up with the primary level
mark on the LWCO
.
ASME Drum stamping:
The ASME “H” Stamp is riveted directly to the boiler frame when ASME approval is given and
is located above the medium temperature return to the left.
Load Bearing Point sticker:
Besides the lifting lugs, this shows the only locations the boiler should be lifted from.