Printed in the Federal Republic of Germany
TR-Electronic GmbH 2013, All Rights Reserved
08/31/2017
TR - ECE - BA - DGB - 0105 - 03
Page 77 of 103
5 Commissioning
5.1 Device description file, SDDML
The XML file contains all information on the measuring system-specific parameters
and the operating modes of the measuring system. The XML file is integrated by the
Sercos network configuration tool, in order to enable correct configuration and
commissioning of the measuring system.
The XML file is called
“TR-54524353-Vxxx-TRCE-FSP-Encoder.xml”
.
Download:
www.tr-electronic.de/f/TR-ECE-ID-MUL-0041
5.2 Setting the network parameters
The network parameters are adjusted via the
Unified Communication Channel
(UCC) and transferred as NON-Sercos-III-Protocol. The UC-channel is only active
while the communication phases NRT, CP0 and CP1.
Changes via the service channel are stored and become effective when entering the
NRT mode.