G9000 Installation and Operation Manual
29
FIGURE 2.10.2
External Signal Terminal Block (NEC Class2)
TN1
(User supplied dry
contact)
IN3: BATTERY TEMP. HIGH
IN1: REMOTE INVERTER START
IN2: REMOTE INVERTER STOP
REMOTE EPO
IN4: POWER DEMAND
UPS
CB2 UVT
CB2 AX
52L AX
1
3
5
7
9
19
17
15
13
11
2
4
6
8
10
20
18
16
14
12
Battery
Breaker
Panel
Load Circuit Switch
Summary of Contents for T90S3S08KS6XSN
Page 21: ......
Page 23: ......
Page 25: ......
Page 27: ......
Page 29: ...G9000 Installation and Operation Manual ...
Page 31: ...G9000 Installation and Operation Manual ...
Page 98: ...G9000 Installation and Operation Manual 61 APPENDIX A Installation Planning Guides IPG ...
Page 99: ...62 G9000 Installation and Operation Manual ...
Page 100: ...G9000 Installation and Operation Manual 63 ...
Page 101: ...64 G9000 Installation and Operation Manual ...
Page 102: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......