![Toshiba T2150 series Maintenance Manual Download Page 138](http://html.mh-extra.com/html/toshiba/t2150-series/t2150-series_maintenance-manual_425961138.webp)
T2150 Series
4-23
Installing the AC PS unit
To install the T2150 series AC PS unit, follow the steps below and refer to figure 4-18.
1.
Seat the
LED cover/power switch frame
on the system unit (figure 4-18).
2.
Secure
three M2.5x8 silver screws
on the
LED cover/power switch frame
(figure 4-18).
3.
Seat the
AC PS unit
with
AC power socket
on the system unit and connect the
power supply cable
to
PJ501
on the system board (figure 4-18).
4.
Secure
one M2.5x10 screw
on the AC PS unit (figure 4-18).
5.
Install the battery pack, optional PCMCIA card, optional memory module, key-
board, hard disk drive, top cover, and display assembly as described in sections 4.7
back through 4.2.
Summary of Contents for T2150 series
Page 22: ...T2150 Series 2 3 Figure 2 1 Troubleshooting flowchart 1 2 ...
Page 135: ...4 20 T2150 Series Figure 4 17 Removing the top cover display assembly ...
Page 163: ...B 2 T2150 Series Figure B 2 FHVSY system board back ...
Page 164: ...T2150 Series B 3 B 2 FHWSD Board Figure B 3 FHWSD board ...
Page 181: ...C 14 T2150 Series ...
Page 182: ...T2150 Series D 1 Appendix D USA Display Codes Table D 1 USA display codes ...