T2100 Series
4-33
Installing the LCD Module
To install the T2100’s LCD module, follow the steps below and refer to Figure 4-23.
1.
Connect the
two display cables
to
CN1
and
CN2
on the LCD module.
2.
Place the
LCD module
in the cover and route the
cables
so they will not be
pinched by the display panel or other components.
3.
Secure the
LCD module
with
four M2.5x6 screws
.
4.
Install the FL inverter board, display mask, optional PCMCIA card, optional
memory card and battery pack as described in Sections 4.12, 4.11, 4.4, 4.3 and
4.2.
Summary of Contents for T2100 Series
Page 5: ...T2100 Series 1 5 Figure 1 2 T2100 T2105 Series system unit configuration ...
Page 25: ...T2100 Series 2 3 Figure 2 1 Troubleshooting flowchart 1 2 ...
Page 114: ...3 64 T2100 Series ...
Page 168: ...B 2 T2100 Series Figure B 2 FHVSY system board back ...
Page 180: ...C 10 T2100 Series ...
Page 181: ...T2100 Series D 1 Appendix D USA Display Codes Table D 1 USA display codes ...
Page 182: ...D 2 T2100 Series ...
Page 196: ...H 2 T2100 Series ...
Page 198: ...I 2 T2100 Series ...