3-26
T6600C, T6600C/CD, T6600C/CDV
Subtest 03
Point to point (Send)
NOTE
: To execute this subtest, two machines must be connected with an
RS-232-C direct cable. One machine should be set as “send” (Subtest 03)
and the other set as ‘receive’ (Subtest 04). The wiring diagram for the RS-
232-C direct cable is described in Appendix G.
This subtest sends 20h through 7Eh data to the receive side, then receives the
sent data and compares it to the original data.
Subtest 04
Point to point (Receive)
This subtest, used with Subtest 03 described above, receives the data from the
send side, then sends the received data.
Subtest 05
Not used.
Subtest 06
Interrupt Test (IRQ 4, 3, 5)
This subtest checks the Interrupt Request Level of IRQ 4, 3 and 5 from the
send side.