4 Replacement Procedure
4.31 Fluorescent Lamp
Assembly of outside Tape and Cover shield
1.
Assembly of Cover shield (S).
CAUTION: Pressure or stress should not be given on Source PCB.
Usage of gloves with anti-electric discharge coating is recommended.
To eliminate possible damage on circuits occurred by ESC.
2.
Assembly of Cover shield (G).
CAUTION: Pressure or stress should not be given on Gate TCP.
3.
Assembly of Tape Adhesive used for Top case fixing.
4.
Assembly of Tape Adhesive used for B/L Wire fixing.
CAUTION: Pressure or stress should not be given on Top case during this process.
Figure 4-54 Replacing LG.Philips fluorescent lamp (WXGA) (8)
4-86
[CONFIDENTIAL]
TECRA A8 /Satellite Pro A120 Maintenance Manual (960-573)
Summary of Contents for Satellite Pro A120
Page 10: ...x CONFIDENTIAL TECRA A8 Satellite Pro A120 Maintenance Manual 960 573 ...
Page 11: ... CONFIDENTIAL Chapter 1 Hardware Overview ...
Page 12: ...1 Hardware Overview 1 ii CONFIDENTIAL TECRA A8 Satellite Pro A120 Maintenance Manual 960 573 ...
Page 45: ... CONFIDENTIAL Chapter 2 Troubleshooting Procedures ...
Page 129: ... CONFIDENTIAL Chapter 3 Tests and Diagnostics ...
Page 241: ...Chapter 4 Replacement Procedures CONFIDENTIAL ...
Page 337: ... CONFIDENTIAL Appendices ...
Page 338: ...Appendices App ii CONFIDENTIAL TECRA A8 Satellite Pro A120 Maintenance Manual 960 573 ...
Page 346: ...Appendices App x CONFIDENTIAL TECRA A8 Satellite Pro A120 Maintenance Manual 960 573 ...