
e-STUDIO2500c/3500c/3510c TRANSFER UNIT
May 2006 © TOSHIBA TEC
13 - 12
Notes:
Follow the procedure below for the installa-
tion.
1. When installing, be sure to check if the
TBU separation lever is at the fixed posi-
tion (horizontal position) with the transfer
belt installed.
2. Check if the TBU cleaner pressure hook
is locked. If it is released, rotate the TBU
cleaner pressure hook lever to lock it as
shown in the figure, otherwise the transfer
belt cleaning unit cannot be installed.
3. Insert the A portion of the transfer belt
cleaning unit beneath the stay (B) of the
main frame.
4. Align the portion (C) of the transfer belt
cleaning unit with the portion (D) of the
main frame, then slide the transfer belt
cleaning unit along the stay (B) of the
main frame all the way in.
5. Rotate the lever (sky blue) clockwise to lift
it up until it clicks.
Fig. 13-7
Fig. 13-8
TBU cleanner pressure hook
Release position
Fixed position
A
B
C
D
Transfer belt
cleaning unit
Summary of Contents for e-STUDIO2500c
Page 130: ...e STUDIO2500c 3500c 3510c CONTROL PANEL May 2006 TOSHIBA TEC 5 18 ...
Page 158: ...e STUDIO2500c 3500c 3510c SCANNER May 2006 TOSHIBA TEC 6 28 ...
Page 168: ...e STUDIO2500c 3500c 3510c IMAGE PROCESSING May 2006 TOSHIBA TEC 7 10 ...
Page 188: ...e STUDIO2500c 3500c 3510c DRIVE SYSTEM May 2006 TOSHIBA TEC 9 2 ...
Page 232: ...e STUDIO2500c 3500c 3510c PAPER FEEDING SYSTEM May 2006 TOSHIBA TEC 10 44 ...
Page 256: ...e STUDIO2500c 3500c 3510c PROCESS UNIT RELATED SECTION May 2006 TOSHIBA TEC 11 24 ...
Page 288: ...e STUDIO2500c 3500c 3510c DEVELOPER UNIT May 2006 TOSHIBA TEC 12 32 ...
Page 401: ......
Page 402: ......