20
6
F
8
A
0
5
2
1
Fig.3.3.4 Meter mounted vertically
[NOTE] When you lift the meter using a lifting wire for relocation, installation or for other purposes, use
the wire so that the wire does not touch the RF section of the density meter. We recommend
you use a lifting wire of 2m or more in length (A/2 + A/2 shown below). In case the lifting wire
rubs against the RF section, the RF section may be damaged. Care should be taken not to
damage the RF section by applying cure such as cushioning materials between the lifting wire
and the RF section.
A/2
A/2
Lifting wire
RF section
The center of gravity
Stop valve
Bypass piping
Density meter
Zero point water valve
Zero water piping
Stop valve
Drain
Direction of flow Upward
Drain valve
Stop valve
Air release valve
Figure 3.3.5 Lifting the Density Meter with a Lifting Wire
Summary of Contents for Density (Consistency) Meter LQ500
Page 1: ...6 F 8 A 0 5 2 1 OPERATION MANUAL DENSITY METER TYPE LQ500 ...
Page 2: ......
Page 51: ... 49 6 F 8 A 0 5 2 1 ...
Page 61: ... 59 6 F 8 A 0 5 2 1 ...
Page 93: ... 91 6 F 8 A 0 5 2 1 mode from the setting mode to resume the normal measurement ...
Page 113: ......