25
3-2 Setup file data preparation
Before implementation of installing, prepare the materials for creating the setting files.
• Control wiring diagram
• Power meter wiring diagram
• Air conditioner addresstable
• Schedule table
3-2-1 Control wiring diagram (Connection example)
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U1,U2
U3,U4
U3,U4
U3,U4
U3,U4
U3,U4
U3,U4
U3,U4
U3,U4
16th floor
T
o
uch Screen
Controller
Switching
HUB
8 door-lock control signal inputs
8 fire alarm inputs
8 power meter inputs
1st-8th
floor
9th-16th
floor
1st floor
2nd floor
15th floor
Digital Input/Output
Relay Interface
BMS-IFDD01E
Energy Monitoring
Relay Interface
BMS-IFWH3E
Energy Monitoring
Relay Interface
BMS-IFWH3E
Intelligent
Server
BMS-LSV2E
PC for creating
monthly reports
Printer
Main BUS
TCS-NET Relay Interface
TCS-NET Relay Interface
TCS-NET Relay Interface
TCS-NET Relay Interface
Outdoor unit
Indoor unit
Digital Input/Output
Relay Interface
BMS-IFDD01E
BMS-
IFLSV1E
Intelligent server
software
BMS-STCC
Intelligent
Server
BMS-LSV2E
Intelligent server
software
BMS-STCC
BMS-
IFLSV1E
BMS-
IFLSV1E
BMS-
IFLSV1E
8 power meter inputs
Summary of Contents for BMS-TP0640ACE
Page 1: ...FILE NO A04 016 TCS NET AIR CONDITIONING CONTROL SYSTEM TOUCHSCREENCONTROLLER TENTATIVE ...
Page 16: ...16 ...
Page 17: ...17 2 SYSTEM CONFIGURATION 2 1 Touch screen controller system configuration ...
Page 22: ...22 ...
Page 54: ...54 ...
Page 96: ...96 ...
Page 103: ...103 ...
Page 104: ......