Energy Monitoring
Relay Interface
connection check
Check the connection when the Energy Monitoring Relay Interface is connected and an energy
meter input name is set in the setting file.
1
Display “Alarm List” on the PC, and check that the S06:BMS-IFWH communication error is
not detected.
2
Use the energy meter integrated value check tool to check that a pulse from the energy
meter has been input to the Energy Monitoring Relay Interface.
6
Power distribution
check
1
Operate the air conditioner for several hours with the controller in operation.
2
Perform manual meter-reading from the PC. “Option” > “Manual Meter-Reading” > “Go”
(Do not select “don’t continue data reading”.)
3
Wait for approx. 1 minute until a manual meter-reading file is created.
4
Selecting “Option” > “Manual Meter-Reading” displays the file created in “Data reading
completed”.
5
Download a monthly report file with the Monthly Report Creation Software.
6
Select the file displayed in (4) in [File setting].
7
Check the output result of the monthly report created.
7
Scheduled operation
check
—
8
PC connection check
on site
—
No.
Check item
No.
Procedure
Error message
×
NG:
The S06 alarm is
displayed.
1) Check if RS-485 communication is in the normal state.
(Refer to “15-6. RS-485 Communication Check”)
{
OK:
The S06 alarm is not
displayed.
Proceed to the next check.
Error message
×
NG1:
After the several-hour
operation of the air
conditioner, the pulse
integrated value does
not change.
1) In the test mode, check with the LED on the Energy
Monitoring Relay Interface if the pulse from the energy
meter has been input in the interface.
(For further details, refer to “7. Trial Operation Check -
Confirming external input connection” in the Owner’s
manual of Energy Monitoring Relay Interface.)
{
OK:
The pulse integrated
values of all the energy
meter set in the setting
file have changed.
Proceed to the next check.