g013780
Figure 83
1.
Actuator
4.
Cotter
2.
Actuator rod
5.
Pin
3.
Boom-pivot pin housing
3.
Lift up on the boom and remove the pin (
), and slowly lower the boom to the ground.
4.
Inspect the pin for any damage, and replace it
if necessary.
5.
Use a wrench on the flat sides of the actuator rod
to immobilize it, then loosen the jam nut to allow
the eyelet rod to be manipulated (
).
g014220
Figure 84
1.
Flat on the actuator rod
5.
Eyelet adjusted
2.
Jam nut
6.
Eyelet position for
assembly
3.
Eyelet
7.
Jam nut tightened to lock
new position
4.
Jam nut loosened
6.
Turn the eyelet rod in the actuator rod to shorten
or lengthen the extended actuator to the desired
position (
Note:
You must turn the eyelet rod in half or
complete revolutions so that you can assemble
the rod to the boom.
7.
Once the desired position has been achieved,
tighten the jam nut to secure the actuator and
eyelet rod.
8.
Raise the boom to align the pivot with the
actuator rod.
9.
While holding the boom, insert the pin through
both boom pivot and actuator rod (
10.
With the pin in place, release the boom and
secure the pin with the cotter previously
removed.
11.
Repeat the procedure for each actuator rod
bearing, if necessary.
64
Summary of Contents for Multi Pro WM 41240
Page 79: ...Schematics g255886 Flow Diagram Sprayer System DWG 125 0699 Rev B 79...
Page 80: ...Notes...
Page 81: ...Notes...
Page 82: ...Notes...