125-6109
1.
Electrical shock hazard—when the Zap-Alert system is
activated by a power strike, do not leave the operator’s
position or touch the ground and the machine at the same
time; the machine will be energized with electrical power.
125-6111
1.
Stake up
6.
Stake up
2.
Stake down
7.
Stake spin
counterclockwise
3.
Stake spin
counterclockwise
8.
Stake down
4.
Stake spin clockwise
9.
Stake spin clockwise
5.
Left stake
10.
Right stake
125-6123
1.
Load pipes from back row first.
125-6124
1.
Center the pipe joint between the upper (makeup/breakout
wrench) and lower wrenches (stationary wrench).
13