3.10
FITTING ELECTRONIC BOARD AND CEILING LIGHT ASSEMBLY
16.
ATTENTION: before moving on to the next step, carry out the electrical wiring (chapter 4)
and the operational test of the entire automation, mounting the internal sensor
provisionally.
15.
Fit the electronic board assembly (2 no. screws).
17.
Fit the ceiling lamp (10 no. screws and connect 3 no. connectors).
15
17
Ch.6
connector
bolt
bolt
bolt
bolt
bolt
bolt
connector
bolt
bolt
connector
bolt
bolt
18
EN
INSTRUCTIONS FOR INSTALLATION AND USE
DUEVILLE
Summary of Contents for DUEVILLE
Page 2: ......
Page 52: ...52 EN INSTRUCTIONS FOR INSTALLATION AND USE DUEVILLE ...
Page 53: ...EN INSTRUCTIONS FOR INSTALLATION AND USE DUEVILLE 53 ...
Page 54: ...54 EN INSTRUCTIONS FOR INSTALLATION AND USE DUEVILLE ...
Page 55: ...EN INSTRUCTIONS FOR INSTALLATION AND USE DUEVILLE 55 ...
Page 56: ...56 EN INSTRUCTIONS FOR INSTALLATION AND USE DUEVILLE ...
Page 57: ...EN INSTRUCTIONS FOR INSTALLATION AND USE DUEVILLE 57 ...
Page 58: ...58 EN INSTRUCTIONS FOR INSTALLATION AND USE DUEVILLE ...
Page 59: ...EN INSTRUCTIONS FOR INSTALLATION AND USE DUEVILLE 59 ...