background image

13 

Warning Light (Included in some models, refers to the actual package) 

The red wire of the warning light should be inserted into 

LAMP (#11) 

terminal, the white wire into the 

LAMP-

 

(#12) 

terminal.

 

Back-up Battery & Solar Panel & Solar Controller (optional) 

If there is 

no solar panel

 to be used for charging the battery, then the

 “24V+”

 of the battery should be wired to 

the 

BAT+ (#19)

 terminal. 

“24V-”

 should be wired to 

“BAT-” (#18) 

terminal. 

The battery could also be charged by the solar panel & solar controller. Please refer to the manual instruction of 

solar panel and controller separated for wire connection. 

Photocell Beam System (PBS) (Included in some models, refers to the actual package) 

Use a 2-core cable to connect the 

“- ~”

 terminal of the photocell’s emitter to the “14” terminal, the 

“+ ~”

 terminal 

to the “13” terminal. Also the 

“- ~”

 and 

“+ ~”

 terminals of the photocell’s receiver should be connected to the 

“14” and “13” terminals in parallel.

 

Use another 2-core cable to connect the 

“COM”

 terminal of the receiver to the “15” terminal, the 

“NC”

 terminal 

to the “16” terminal.

 

Push Button (optional) 

The push button should be wired to the

  GND

  (#16)  and 

O/S/C

  (#17)  terminals. The gate operator works 

alternately by pushing the button (open-stop-close-stop-open). 

External Receiver (optional) 

The 

BROWN

 wire of the external receiver should be connected into the “17” terminal. 

The 

BLACK

 wire of the external receiver should be connected into the “16” terminal. 

The 

RED

 wire of the external receiver should be connected into the “13” terminal. 

Wired Keypad (24VDC) (optional) 

The 

RED

 wire of the wired keypad should be connected into the “13” terminal. 

The 

BLACK

 wire of the wired keypad should be connected into the “14” terminal. 

The 

PURPLE

 wire of the wired keypad should be connected into the “16” terminal. 

The 

BLUE

 wire of the wired keypad should be connected into the “17” terminal. 

 

How to Program or Erase the Remote 

 

The remote MUST be programed to the opener BEFORE OPERATING. Please follow the steps to 

program the remote. 

 

Activate the opener only when gate is in full view, free of obstruction and properly adjusted. No one 

should enter or leave gate area while gate is in motion. DO NOT ALLOW CHILDREN to operate push 

button or remote. DO NOT ALLOW CHILDREN TO PLAY NEAR THE GATE. 

 

If you purchase additional remote controls, the gate opener must be programmed to accept the new 

remote code. 

 

If you lose one of any remote control, please erase and reprogram all other remote controls to have a 

new code for safety. 

 

Program the remote 

Press and release the learn button, the 

LED

 will display 

“Ln”,

 then press 

the key in the remote twice in 2 seconds, the 

LED

 will flash

 “Ln”

 for 4 

seconds then back to 

“-  -”

. Now the remote has been programed 

successfully. 

Erase all the remote codes 

Press and hold the learn button until the 

LED

  display “dL”, release the 

button and the LED will be back to 

“- -”

. Now all remote codes have been erased. 

Summary of Contents for AT602

Page 1: ...VER 20a AT602 Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the battery Periodic ch...

Page 2: ...on for Installation 6 Install the Gate Opener on the Gate 6 Mounting the Control Box 10 Connection of Power Supply 11 Connecting of the Control Board 11 How to Program or Erase the Remote 13 How to Us...

Page 3: ...destrian access shall be located such that persons will not come in contact with the moving vehicular gate 8 Pedestrians should never cross the pathway of a moving gate The gate opener is not acceptab...

Page 4: ...er or other underground utility lines contact underground utility locating companies BEFORE digging SAVE INSTRUCTION 14 Do not permit children to play on or around the gate and keep all controls out o...

Page 5: ...Accessories Parts List Available at TOPENS Store Tools Needed Power Drill Tape Measure Open End Wrenches 14 17 or Adjustable Wrenches Wire Strippers C Clamps small medium and large Level Hacksaw or He...

Page 6: ...al Single gate running mode Adjustable opening closing interval between master and slave gate Stop in case of obstruction during gate opening Reverse in case of obstruction during gate closing Built i...

Page 7: ...n Overview Pull to Open Gates Important The second gate opener cable should be put into the PVC conduit not provided which is buried underground This protects the cable from lawn mowers and string tri...

Page 8: ...ckets to wooden posts a larger size washer or metal plate should be used between the bolts and the wooden post to ensure the stability of the fastening hardware If the post is smaller than 6 diameter...

Page 9: ...te opener insert the release key and turn the key 90 clockwise This releases the motor and allows the push pull rod to be manually extended and retracted To restore normal operation turn the key 90 co...

Page 10: ...f there is not at least 2 5cm of clearance or if the opener and the Post Pivot Bracket are binding rotate the Post Pivot Bracket and or move the Post Bracket Assembly to obtain the minimum clearance a...

Page 11: ...ach bolt with one 10 washer one 10 lock washer and one 10 nut 9 Attach the gate brackets to each gate by inserting two M10 x 75 bolts through the gate brackets and the drilled holes in the gates Faste...

Page 12: ...s waterproof designed for safety reason and a longer service life it is recommended to install the control box inside a secure surface and at least 100 cm 40 inches above the ground to avoid being flo...

Page 13: ...awn mowers weed eaters and grazing animals 4 The fuse in the control board is interchangeable A 10a 250vac 5 20mm fuse is suitable to the control board Connecting of the Control Board Actuator 1 Inser...

Page 14: ...12...

Page 15: ...LACK wire of the external receiver should be connected into the 16 terminal The RED wire of the external receiver should be connected into the 13 terminal Wired Keypad 24VDC optional The RED wire of t...

Page 16: ...e Button B is designed to realize midway function refer to more details in our TOPENS sliding gate opener manual So it is must program button A with sliding gate opener while you may program either C...

Page 17: ...ital Display which means gate opens out from the property push to open Press the FUNC button to store the data when the master slave gate is chosen The Digital Display will indicate P3 Now PUSH PULL T...

Page 18: ...is adjusted by pressing INC and DEC buttons respectively The Digital Display will show 1 9 which indicates the stall force levels 1 means the minimum force and 9 is the maximum force Each time you pr...

Page 19: ...iod of soft start You can press the INC or DEC button to set the period of soft start There is 1 9 seconds available in setting Press the FUNC button to store the data when the period is set The Digit...

Page 20: ...ar the actuator retracts It will retract to the end when using Adjust Limit switch B to decide how far the actuator 2 extends Use a screwdriver to loosen the screw of Limit Switch B slide Limit Switch...

Page 21: ...ff and allow transformer to cool for several minutes then reset Replace the transformer if the symptom still exists 3 Check the fuse in the control board Replace the fuse if necessary Opener powers up...

Page 22: ...UE GREEN YELLOW wires of the arm are not shorted 2 Limit switch of the arm is faulty Replace the limit switch as necessary Gate opens closes or stops on its own 1 Please make sure the P2 setting of th...

Page 23: ...21 Quick Setting Guide...

Page 24: ...22...

Page 25: ...23...

Page 26: ...24...

Page 27: ...e do not hesitate to contact us E mail support topenstool com Kindly include your Product Model Purchasing Date Site Order and your contact information All your concerns will be replied within 24 hour...

Reviews: