Technical Support Bulletins
Spectronic GENESYS 10 EEPROM replacement (Firmware Rev. 1.030 and earlier)
Caution
Do not begin this procedure unless you have a Spectronic GENESYS 10
Service manual (Catalog number 335901-10020) and a certified wavelength
filter.
This upgrade procedure requires the use of a didymium filter (certified or
non-certified) for the wavelength calibration of the instrument and the use
of a traceable wavelength standard for final testing and certification after
calibration. (This may be the same didymium filter used for calibration if a
certified didymium filter was used for the calibration.)
•
Thermo Electron Corporation sells wavelength filters:
•
Filter Set (catalog number 942318503111) which includes a traceable holmium filter (can be used
only for final testing & certification) and a traceable didymium filter (can be used for both
calibration and certification)
•
SPECTRONIC Standards (catalog number 333150) which includes a traceable wavelength filter
(can be used only for final testing & certification)
•
Non-certified didymium filter (catalog number 333159) for only the wavelength calibration
•
Performing this upgrade will cause any stored tests to be deleted due to improvements in the
software and resultant data structures. Therefore, we recommend printing or otherwise recording your
test setup screens for greater ease in re-programming them.
•
Observe proper ESD procedures.
•
Use appropriate tools (e.g., PLCC extractor tool).
•
A Personal Computer is required to perform this procedure, along with a working RS232 serial port
and interface cable (Part #335942 or equivalent*).
•
The Spectronic GENESYS 10 Service Diagnostic software
Rev. 1.40 or higher
(included in your
service manual, or sold separately as Part # 335901-10005) is also required to perform this upgrade.
* Serial Cable pinout:
Instrument
<----------> Computer
Pin
(9-pin)(25-pin)
Transmit
2 <----------> 2 3 Receive
Receive 3 <----------> 3 2 Transmit
Ground 5
<----------> 5
7
Signal
Ground
CTS
7
<----------> 7
4
RTS
RTS
8
<----------> 8
5
CTS
Procedure
1. Turn off and disconnect power from the instrument.
2. Turn the instrument upside down, being careful not to scratch the plastic cover.
3. Ensure that proper ESD protection is in place.
4. Remove the four (4) screws that secure the bottom cover to the instrument base
Caution: The bottom cover is wired to the instrument base.
5. Remove the cover gently, so as not to stress the ground wire connection.
6. Using a PLCC ROM extractor tool, remove the ROM (marked with a label). The board is marked
U39 next to the socket. This is the only Integrated Circuit (IC) on the Main Circuit board that is
socketed and can be removed. Do not attempt to remove any other components, including
connectors or jumpers. (See Figure 11.1 Close-up photo of the socket and ROM [on next page].)
11-9
Summary of Contents for Spectronic BioMate 3
Page 1: ......
Page 6: ...This page intentionally left blank vi ...
Page 13: ...Optical Diagram Figure 1 1 Optical Diagram Shown are both UV Vis and Vis Optics 1 5 ...
Page 14: ...Specifications This page intentionally left blank 1 6 ...
Page 22: ...Troubleshooting Guide This page intentionally left blank 3 6 ...
Page 36: ...Routine Maintenance This page intentionally left blank 4 8 ...
Page 72: ......
Page 78: ...Drawings This page intentionally left blank 8 2 ...
Page 79: ...Drawings 8 3 Figure 8 1 Spectronic GENESYS 10 Wiring Diagram ...
Page 80: ...wings 8 4 This page intentionally left blank Dra ...
Page 81: ...Drawings 8 5 Figure 8 2 Keypad Schematic ...
Page 82: ...wings 8 6 This page intentionally left blank Dra ...
Page 84: ...wings 8 8 This page intentionally left blank Dra ...
Page 86: ...Drawings This page intentionally left blank 8 10 ...
Page 88: ...Drawings This page intentionally left blank 8 12 ...
Page 90: ...Drawings This page intentionally left blank 8 14 ...
Page 92: ...Drawings This page intentionally left blank 8 16 ...
Page 94: ...Drawings This page intentionally left blank 8 18 ...
Page 96: ...Drawings This page intentionally left blank 8 20 ...
Page 98: ...Drawings This page intentionally left blank 8 22 ...
Page 100: ...Drawings This page intentionally left blank 8 24 ...
Page 102: ...Drawings This page intentionally left blank 8 26 ...
Page 104: ...Drawings This page intentionally left blank 8 28 ...
Page 106: ...Drawings This page intentionally left blank 8 30 ...
Page 108: ...Drawings This page intentionally left blank 8 32 ...
Page 110: ...Drawings This page intentionally left blank 8 34 ...
Page 112: ...Drawings This page intentionally left blank 8 36 ...
Page 114: ...Drawings This page intentionally left blank 8 38 ...
Page 116: ...Drawings This page intentionally left blank 8 40 ...
Page 118: ...Drawings This page intentionally left blank 8 42 ...
Page 120: ...Drawings This page intentionally left blank 8 44 ...
Page 122: ...Drawings This page intentionally left blank 8 46 ...
Page 124: ...Drawings This page intentionally left blank 8 48 ...
Page 126: ...Drawings This page intentionally left blank 8 50 ...
Page 128: ...Drawings This page intentionally left blank 8 52 ...
Page 130: ...Drawings This page intentionally left blank 8 54 ...
Page 132: ...Drawings This page intentionally left blank 8 56 ...
Page 134: ...Drawings This page intentionally left blank 8 58 ...
Page 136: ...Drawings This page intentionally left blank 8 60 ...
Page 138: ...Drawings This page intentionally left blank 8 62 ...
Page 140: ...Drawings This page intentionally left blank 8 64 ...
Page 142: ...Drawings This page intentionally left blank 8 66 ...
Page 144: ...Drawings This page intentionally left blank 8 68 ...
Page 146: ...Drawings This page intentionally left blank 8 70 ...
Page 148: ...Drawings This page intentionally left blank 8 72 ...
Page 150: ...Drawings This page intentionally left blank 8 74 ...
Page 152: ...Drawings This page intentionally left blank 8 76 ...
Page 166: ...Service Diagnostic Software This page intentionally left blank 9 14 ...
Page 170: ...Technical Support Bulletins This page intentionally left blank 10 4 ...