S
S
S
S
S
ECTION
ECTION
ECTION
ECTION
ECTION
2
2
2
2
2
S
ETUP
AND
I
NSTALLATION
2-10 O
PERATING
G
UIDE
, TEOM 1405
T
HERMO
F
ISHER
S
CIENTIFIC
3. Measure and mark a spot in the roof directly above the 1/2-inch
sample line on the top of the instrument.
Note.
Note.
Note.
Note.
Note. In this example, a 4-inch hole was cut in the roof to
accommodate a 4-inch PVC pipe and seal. The cap of the PVC
pipe was then drilled to accommodate the sample line.
▲
4. Drill the hole in the roof for the 1/2-inch sample line and another hole
for the 3/8-inch bypass line tubing. (The bypass tubing may also be run
through a window or other opening.)
5. Set the tripod on the roof above the 1405 unit and adjust the legs so
the top of the tripod is above the roof opening.
Figure 2-10.
Figure 2-10.
Figure 2-10.
Figure 2-10.
Figure 2-10.
Installing the sample tubes and
bypass line through the roof.
Flow splitter (with bypass)
Sample tube extensions
(1 3/4-inch centers)
Summary of Contents for TEOM 1405
Page 2: ......