3-2
Shake ‘n Stack
Thermo Scientific
Section 3
Set Up the Shaking Platform
3. Slide drive arm assembly sleeve onto
rotisserie drive shaft, aligning
location peg within drive arm sleeve
into either slot on drive shaft,
ensuring the sleeve is pushed fully
onto shaft. Tighten using thumb
screw.
4. Locate front left peg of tray into
the hole at the end of the drive
arm.
5. Slide the rear left peg into the
horizontal slot on the left-hand side
of bracket at the back of oven.
Assembly is now complete and
ready to operate.
Figure 4.
Slide Sleeve onto Shaft
Figure 5.
Tray Peg into Arm Hole
Figure 6.
Rear Peg into Slot
Summary of Contents for Shake 'n Stack 6244
Page 13: ...2 4 Shake n Stack Thermo Scientific Section 2 Unpacking and Installation...
Page 21: ...4 6 Shake n Stack Thermo Scientific Section 4 Methodology of Hybridisation...
Page 27: ...7 2 Shake n Stack Thermo Scientific Section 7 Use of Radioactive Probes...
Page 31: ...8 4 Shake n Stack Thermo Scientific Section 8 Technical Specifications...
Page 32: ...Shake n Stack 8 5 Thermo Scientific Section 8 Technical Specifications...
Page 33: ...8 6 Shake n Stack Thermo Scientific Section 8 Technical Specifications...
Page 34: ...Shake n Stack 8 7 Thermo Scientific Section 8 Technical Specifications...
Page 35: ...8 8 Shake n Stack Thermo Scientific Section 8 Technical Specifications...
Page 36: ...Shake n Stack 8 9 Thermo Scientific Section 8 Technical Specifications...
Page 37: ...8 10 Shake n Stack Thermo Scientific Section 8 Technical Specifications...
Page 38: ...Shake n Stack 9 1 Thermo Scientific Section 9 Electrical Schematics...
Page 39: ...9 2 Shake n Stack Thermo Scientific Section 9 Electrical Schematics...
Page 40: ...Shake n Stack 9 3 Thermo Scientific Section 9 Electrical Schematics...
Page 41: ...9 4 Shake n Stack Thermo Scientific Section 9 Electrical Schematics...
Page 42: ......
Page 50: ...A 8 Shake n Stack Thermo Scientific...
Page 51: ...HYBRIDISATION GUIDE USER INSTRUCTION MANUAL Manual 7222060 Rev 0...
Page 91: ......