3
|
Installation Environmental Considerations
Section
Section
Thermo Scientific
Orion 2295 Phosphate Analyzer
|
17
Connect the Phase Hot or L (line), Earth and Neutral to the terminal block. Note the location
of the fuse.
Insert the wire into the terminal connector and make sure to tighten the screw.
Route signal connections to the back hub, and power connections separately to the front
hub.
All connections must conform to local safety standards.
Figure 7: Electrical wiring ports
Figure 8: AC power connections
Table 1: AC power terminal wire
connections
Analyzer Terminal Destination
North America Wire Color
European Wire Color
HOT or L ( Line)
black
brown
Protective Earth Ground (PG)
green
green with yellow tracer
Neutral (n)
white
blue
NOTE:
When using a UL/CSA approved power cord, loop cord through clip
retainer as shown in
Figure 8
for proper strain relief.
AC POWER
CONNECTIONS