Revolution Series PT-3500 / PT-7500 Puller Tensioner Page 109
Maintenance
Pre-Operation Inspection Checklist
(Page 3)
13.
Inspect Fire Extinguisher.
a.
Inspect fire extinguisher charge, and ensure that
gauge shows within charge limits.
b.
Inspect the physical condition of the extinguisher- (cylinder, hose/cone assembly, etc.),
for any signs of damage or corrosion.
c.
Ensure that hinge pin is in place, to prevent accidental discharge.
d.
Ensure that the plastic safety seal is secured to hinge pin, and that
it has not been removed.
e.
Inspect mounting strap/bracket assembly to
ensure extinguisher is secured to structure.
NOTE:
If safety seal is missing or is broken, extinguisher may have been
tampered with or have already been used- indicating the need for re-
inspection/replacement.
NOTE:
If undercharged or overcharged, see instructions
on label- replacement may be required.
(Additional
minimum monthly/annual inspections required- see
instruction label on extinguisher for details.)
Summary of Contents for PT-3500
Page 1: ...PT 3500 PT 7500 Puller Tensioner Operators Manual...
Page 2: ......
Page 6: ......
Page 9: ......
Page 81: ......
Page 83: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 79 Troubleshooting...
Page 84: ...S R Revolution Series PT 3500 PT 7500 Puller Tensioner Page 80 Fuse Relay Wiring Schematic...
Page 89: ......
Page 129: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 121...
Page 131: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 123...
Page 133: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 125...
Page 134: ...Revolution Series PT 3500 PT 7500 Puller Tensioner Page 126 A...