6
Commissioning
60
5
Select Saveris routers in the order in which they should be connected in
series starting from the Saveris base (from left to right).
6
Click on
[OK]
.
7
Check assignment in the structure diagram and click on
[OK]
.
8
Position the Saveris routers in their mounting locations to check the
radio links.
9
Briefly press the
Connect
key on the rear of the router that is nearest to
the Saveris base in the series (router 1 in the image).
If the LED on the front of the router flashes
•
green, there is a radio link to the Saveris base.
•
red, there is no radio link to the Saveris base.
10
Briefly press the
Connect
key on the rear of the Saveris router that is
downstream from the first router in the series (router 2 in the image).
If the LED on the front of the Saveris router flashes
•
green, there is a radio link to the Saveris router connected upstream
of it in the series.
•
red, there is no radio link to the Saveris router connected upstream
of it in the series.
11
Briefly press the Connect key on the rear of the Saveris router that is
downstream from the second Saveris router in the series and is
therefore the furthest from the Saveris base (router 3 in the image).
If the LED on the front of the Saveris router flashes
•
green, there is a radio link to the Saveris router connected upstream
of it in the series.
•
red, there is no radio link to the Saveris router connected upstream
of it in the series.
Summary of Contents for Saveris 2 H2
Page 2: ......
Page 44: ...6 Commissioning 44 5 6 5 7 8...
Page 117: ......
Page 118: ......
Page 119: ......