The ideal solution for chimney stack – is the installation of ready-made pipe units with heat insulation of
«sandwich» type of «Termofor» trademark.
In case of connection of the stove to fixed built-in stove pipe or in other cases it is not recommended to deflect
the axis of chimney stack from the vertical line for more than 45°.
In case of fire in the stove pipe it is necessary to have a clear scheme of actions that shall be elaborated by
consulting the specialist. After the fire in the stove pipe will die down, the stove pipe shall be cleaned and checked
for the destructions. Make sure that there are no flammables around the stove pipe.
Stoves with heat exchange unit help to locate the tank for hot water outside the steam room and install it in
washer. «Termofor» heat exchange units are produced in two variants:
For the first variant water in the heat exchange unit is heated due to hot gases piped into chimney stack. Such
heat exchange unit can be moved by its connecting pipe in any direction.
For the second variant – water heating is carried out due to the direct contact of heat exchange unit walls with
the flame in the fire chamber.
Built-in heat exchange unit with factory assembly is installed from right (or left) side of the stove. If necessary
it can be shifted to another side of the stove – this will allow to install the hot water tank from the side convenient
to the Consumer.
Heat exchange units are made of heat-resisting high-alloy stainless steel with the content of chromium not
less than 13%.
«Termofor» company recommends along with «Tunguska» bath stove use the heat exchange unit «Kostakan»
of «samovar» type of «Termofor» trademark.
Holes in fire chamber and convector walls (in models with heat exchange unit) for the connecting pipes
output are on the both sides of the stove that is why the heat exchange unit can be shifted if necessary to another
side.
It is recommended to carry out the shift of built-in heat exchange unit before the stove assembly. Provided the
stove has been already installed and is in use then it is necessary to carry out its disassembling.
For heat exchange unit shift to another side it is necessary (convector and heat exchange unit fastening for all
models of «Tunguska» bath stove are analogous):
ATTENTION! Bath stove and chimney stack assembly shall be carried out by qualified workers from the
specialized construction and installation company in compliance with the requirements of SNIP 41-01-
2003 (construction codes and regulations) or in compliance with technical norms of the country where the
stove will be used.
ATTENTION! It is strictly prohibited to make dismountable the connections of the stove with the stove pipe
or other structural elements of the room.
ATTENTION! In case of fire in the stove pipe shut the dampers of air supply into the fire chamber, leave the
room and immediately call the firemen.
1) heat exchange unit of «samovar» type installed at the outlet nozzle of the stove pipe (do not supplied as
part of package);
2) built-in heat exchange unit, installed at the wall of fire chamber inside the stove (supplied with the
stove of corresponding model);
ATTENTION! All works shall be carried out when the stove is fully cooled off.
1. Remove the convector frame by unscrewing 4 self-drilling screws (fig.
10
);
2. Remove the convector by unscrewing 5 self-drilling screws (fig. 1
1
);
3. Remove the heat exchange unit (fig. 1
2
) by unscrewing 2 nuts and taking it off the holes, the gaskets
shall stay on the nipples;
9.8. Stoves with heat exchange unit
9.9. Shift of built-in heat exchange unit
38