
March 2022
Table of Contents
Part No. 1268489GT
S
®
Booms • Z
®
Booms
xi
Scheduled Maintenance Inspection Report - Quarterly or Frequent ................... 39
Scheduled Maintenance Inspection Report - Annual ......................................... 40
Programmed Maintenance Inspection Report - Booms ..................................... 41
C-2 Perform Engine Maintenance – 50 Hours ................................................... 42
Quarterly Maintenance Procedures ............................................................... 44
Q-1 Check for Open Bulletins and Owner Registration ...................................... 44
Q-4 Inspect the Electrical Contactors - DC / Bi-Energy Models.......................... 48
Q-6 Inspect the Tires, Wheels and Lug Nut Torque ........................................... 50
Q-7 Check the Generator Belts and Pulleys, Bi-Energy Models ......................... 50
Q-8 Check the Oscillate Directional Valve Linkage (if equipped) ....................... 52
Q-11 Check and Adjust the Engine RPM .......................................................... 54
Q-13 Test the Alarm Package (if equipped) ...................................................... 60
Q-14 Test the Emergency Power System ......................................................... 61
Q-15 Test the Engine Idle Select - Engine Models ............................................ 62
Q-16 Test the Fuel Select Operation - Gasoline/LPG Models ............................ 63
Q-17 Inspect the Calibration Decal - ALC1000 Models ...................................... 64
Q-18 Test the Recovery Mode System - ALC-1000 Models ............................... 66
Summary of Contents for Genie Lift Guard S-40
Page 198: ......