
Maintenance Manual
March 2022
Programmed Maintenance Procedures
180
S
®
Booms • Z
®
Booms
Part No. 1268489GT
3 Inspect the cables for the following:
•
Frayed or broken wire strands
•
Kinks or crushed cables
•
Corrosion
•
Paint or foreign materials on the cable
•
Split or cracked cable ends
Number of broken wires in one rope lay- Replace
All strands of one rope lay
6
One strand in one rope lay
3
1 wire
2 strand
3 one rope lay
Note: Refer to
Cable Replacement Criteria
.
Result: The cables are not damaged or show
excessive wear. Install the cables and
continue use.
Result: The cables are damaged or show
excessive wear, the cables must be replaced
as a set.
4 Inspect the cable diameter. Measure the
diameter in multiple locations along the cable.
Note: Calipers will be required to perform this
procedure.
correct
incorrect
Cable Diameter Specifications
Model
Nominal
Diameter
Minimum
Diameter
S-60, S-65, S-60HF, S-65HF, S-60X, S-60XC, S-65XC,
S-80, S-85 and S-80X (includes TraX™ models)
Extend
.438 inches
11.13 mm
.416 inches
10.5 mm
Retract
.438 inches
11.13 mm
.416 inches
10.5 mm
S-80HF, S-85HF, S-80J, S-80XC and S-85XC
(includes TraX™ models)
Extend
.50 inches
12.7 mm
.475 inches
12 mm
Retract
.438 inches
11.13 mm
.416 inches
10.5 mm
S-100 / 105 / 120 / 125 and SX-125 XC
Extend
.625 inches
15.875 mm
.594 inches
15 mm
Retract
.375 inches
9.5 mm
.357 inches
9 mm
Summary of Contents for Genie Lift Guard S-40
Page 198: ......